Dear Expert
In my project, I have 3 factories. Ech of them includes 125KW solar inverter connected to datalogger 1000 series.
My SCADA System connect to datalogger 1000 installed above factories via Modbus TCP.
I don’t know that when I can do following from SCADA or not:
- Control to each inverter from SCADA. In the modbus document of datalogger, I didn’t see these address.
- Send a setpoint total-active power from SCADA to Datalogger. Datalogger with send control active power command to inverter complicate connecting inverters
Best and Regard.