# Melbourne SE solar installers | Sky Green Installers

**URL:** https://forum.cleanenergyreviews.info/t/melbourne-se-solar-installers-sky-green-installers/968
**Category:** Solar Installations
**Created:** [February 4, 2020, 1:00pm UTC](https://forum.cleanenergyreviews.info/t/melbourne-se-solar-installers-sky-green-installers/968 "2020-02-04T13:00:00Z")
**Posts on this page:** 2
**Page:** 1

<div class="post-metadata">

### Author: ![ron1951](https://forum.cleanenergyreviews.info/letter_avatar_proxy/v4/letter/r/7ab992/32.png) [@ron1951](https://forum.cleanenergyreviews.info/u/ron1951)
#### Post date: [February 4, 2020, 1:00pm UTC](https://forum.cleanenergyreviews.info/t/melbourne-se-solar-installers-sky-green-installers/968/1 "2020-02-04T13:00:00Z")

</div>

Can you please review the following quote:-  
13 Trina - 330W Honey Mono M Half cell 9BB panels  
SMA - Sunny Boy 4.0 1Vi - 4.0 Inverter  
Red Dot Racking with Tilt  
Price $6584.50  
Thank you  
Ron Scharff

---

<div class="post-metadata">

### Author: ![Marty](https://forum.cleanenergyreviews.info/user_avatar/forum.cleanenergyreviews.info/marty/32/4032_2.png) [@Marty](https://forum.cleanenergyreviews.info/u/Marty)
#### Post date: [February 5, 2020, 10:08pm UTC](https://forum.cleanenergyreviews.info/t/melbourne-se-solar-installers-sky-green-installers/968/2 "2020-02-05T22:08:54Z")

</div>

It looks ok Ron. SMA and Trina are solid brands. Might be worth getting a couple more to compare it with.

> [@Melbourne South East & Mornington solar installers](https://perform.discoursehosting.net/t/melbourne-south-east-mornington-solar-installers/689):
>
> We have a quote for the following 4.725kW System, southeast suburbs, Melbourne 15 Seraphim Blade 315W panels Sungrow 5kW inverter Installed on flat roof, 2 storey with good access. Price $6200 before state government rebate and loans. After a site inspection it has been determined that it is impossible to run DC cable to switchboard area and there is no suitable location for external inverter. Micro inverters are the only option and the developer of building has already installed AC cabling…
